Plastic mold factory equipment maintenance of a mold factory growth has a crucial role today, Dongguan plastic mold factory, we take a look at the editing equipment inspection maintenance system of plastic mould factory.
Use 1 on duty post maintenance of the site is not clear, according to the evaluation system of B processing workshop.
2 of the post paste and set on the equipment maintenance procedures were not damaged or lost according to the workshop management, appraisal system B problem.
3 or a class of equipment, tools and other damage or replacement on duty did not accurately record and feedback on leadership, according to the evaluation system of C processing workshop.
4 on duty the equipments according to the requirements of equipment maintenance maintenance and maintenance, according to the evaluation system of C processing workshop.
5 shift maintenance after the scene did not according to the requirements of cleaning and the area is not consistent with the unreacted management of goods, according to the evaluation system of B processing workshop.
Note: the above information by Jiezhen mold finishing in the Internet, welcome to reprint, indicate the source!
Contact: Mr. Zhang
Phone: 13509005172
Tel: 0769-85394568
Email: jiezhen_tech@163.com
Add: Dongguan Changan Licheng Industrial F building
Website:www.128jz.com